|
Technical Requirements
for Puppet Shows
The Spring Valley Puppet
Theater provides all equipment needed including puppet stage, sound
system and lighting.
The puppet theater needs an indoor floor area 12' to 20' wide by
6' deep with a 10' ceiling height. (A 9' ceiling height can be accommodated
if there are no ceiling obstructions, such as lighting fixtures,
beams, etc., within the performance area.)
It is best if the puppet stage can be set up on floor level, rather
than on a raised platform, true auditoriums being the exception.
Set up time is two hours. Take down time is one hour to one hour
and fifteen minutes.
The audience should be seated at least 10' away from the puppet
stage in order to see properly.
A room which can be darkened is preferable.
An electrical outlet close to the performance area is necessary.
|